Sök bland offentliga upphandlingar i hela Sverige

VATTENFALL ELDISTRIBUTION PREQUALIFICATION SYSTEM FOR POWER TRANSFORMERS

Vattenfall Eldistribution AB

Qualification for the system Conditions to be fulfilled by economic operators in view of their qualification: 

Pre­qualification system (PQS); to become pre­qualified (PQ) supplier to Vattenfall Eldistribution of Power

Transformers (PT) from 2 MVA. PQ supplier means that factory is entitled to receive all PT tenders/RFQ for Vattenfall

Eldistribution, Sweden (as long as PQ status is uphold). Only a company that has ownership of a factory that 

manufacture PT can apply and be awarded PQ status. The process for PQ is based on individual factory audit 

to verify that factory/supplier meet mandatory requirements. If one supplier/company want to PQ more than one 

factory, each factory will have it own PQ process as described below. For complete information on conditions/

requirements of PQS, please contact Vattenfall Eldistribution (contact info given in this eNotice). Timeline: Vattenfall

Eldistribution implemented the PQS 1.7.2014. Methods according to which each of those conditions will be verified: 

The PQ process is structured as follows:

1) For not already registered factory/supplier, registration and approval

in VSB and Sellicha system https://group.vattenfall.com/who-we-are/suppliers/supplier-registration (https://group.vattenfall.com/who-we-are/suppliers/supplier-registration)

(already UNCE registered supplier do not need to registrer again in Sellicha).

2) Factory/supplier application to 

become PQ supplier (send email to lars.soderberg@vattenfall.com (mailto:lars.soderberg@vattenfall.com)).

3) Vattenfall send questionnaires to requesting

factory/supplier (email to requester).

4) Factory/supplier filled in questionnaires to be sent to Vattenfall (email to

lars.soderberg@vattenfall.com).

5) Vattenfall evaluation of questionnaires.

6) If Vattenfall approved answers on

questionnaires, Vattenfall on­site factory audit to verify answers to questionnaires and capability to meet technical requirements as set forth in TR01­10E.

7) Based on Vattenfall approved final audit report, factory/supplier is awarded

PQ status.

8) If factory/supplier is located in ‘risk country’, also Vattenfall approved on­site CSR audit is necessary for

PQ status (as not static, eventual ‘risk country’ status will be informed upon supplier application).

Internal identifier: Vattenfall Eldistribution Prequalification System for Power Transformer

This is a re-announcement of earlier PQ system

465439-2016 – Competition

Sweden-Stockholm: Transformers

OJ S 252/2016 30/12/2016

Qualification system – utilities

Supplies

This PQ system is also valid for Vattenfall Eldistribution "sister company" Gotlands Energi AB, org.nr. 5560082157.

Sista ansökningsdag

3022 dagar kvar (2034-03-25)

Förfarande

Selektivt

Publicerad

2024-03-26

Dokumenttyp

Meddelande om upphandling

Leveransorter

Norrbottens län

Diarie-/referensnummer

UH-2024-186

Ta del av den kompletta annonsen i Opic

Genom att logga in i Opic får du tillgång till den kompletta annonsen. Har du inte ett konto kan du enkelt skapa ett gratis gästkonto. 

 

Prova Opic Upphandlingskoll gratis!

Prova Opic Upphandlingskoll gratis!

Missa inga affärer inom offentlig sektor med Opic Upphandlingskoll: 

  • Sveriges mest använda bevakningstjänst
  • Tillgång till alla annonserade svenska upphandlingar
  • Smarta verktyg, sök- och filtreringsmöjligheter
  • Se i vilka upphandlingar dina konkurrenter deltar, vem som vann och avtalstider
  • Kostnadsfri support och svar på upphandlingsfrågor
Prova gratis i 14 dagar - ingen bindningstid