The scope includes a complete installation of fuel handling system on existing fuel yard. The
maximum fuel flow to the boiler will be approximately 300 m3/h. The biofuel will contain forest
residues, bark, sawdust, peat and demolition wood.
Main equipment in the delivery:
• Ground reclaimer storage for biofuel
• Screening station with magnets for separation of metals and crusher for oversized material
• Emergency bin for biofuel
• Belt conveyor to the boiler house
• Complete supporting steel structure including platforms and stairs
• Electrical and automation systems